Construction:
1.) Assemble the prototype shield
2.) Unsolder the existing Header pins from the Receiver (optional). If you don’t, the receiver will sit
at 90 degrees to the Shield which is ok but you’ll need a larger case. Now solder a new straight
header as shown to the receiver board.
3.) Insert the receiver board into the prototype board and solder in place.
4.) I use a wire wrap device to make connections. You can also solder the connections.
Comentários a estes Manuais