Raymarine Universal IO Drive Manual de Instalação Página 36

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 54
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 35
4.2ACUInstallation
LocationrequirementsACU
Theinstallationlocationmusttakeintoaccountthefollowing
requirements:
ACU-200,ACU-300,ACU-400installbelowdecksina
dryarea.
ACU-100installaboveorbelowdecks.
Safefromphysicaldamageandexcessivevibration.
Awayfromanysourceofheat.
Awayfromanypotentialammablehazard,suchasfuel
vapors.
DimensionsACU-100
140 mm (5.5 in)
52 mm
(2.0 in)
180 mm (7.1 in)
159.3 mm (6.3 in)
D12872-1
MountingtheACU-100
Important:Theinstallationmustonlybeperformedwiththe
vesseleitheronhardstanding,ortied-upalongsideapontoon
orberth.
1.Usinganappropriatescrewdriver,undothescrewslocated
onthetopcoverandremovethetopcoverfromtheACU.
0
0
D12873-1
Oncethecoverisremoved,theunit’smountingholesare
accessible.
2.MounttheACUinanappropriatelocationandsecuretothe
mountingsurfaceusingthesuppliedscrews.
D12874-1
Youshouldalsomounttheautopilotcontrolheadandrudder
referenceunit(ifappropriate)atthistime.
3.Toaccessthescrewterminalsforconnectingthecablesto
theACU,removethescrewterminalconnectorsfromthe
sockets,asshowninthefollowingillustration:
D12875-1
3
4
4.InserttherelevantwiresfromtheSeaT alk
ng
spurcableinto
theSeaTalk
ng
screwterminals,asshownintheillustration
above.Tightenthescrewstosecurethewires.Repeatforall
requiredconnections.
5.Pushthescrewterminalsbackintotheconnectorpanel,
ensuringatightconnection.
36
EvolutionEV-1,ACU-100,ACU-200,ACU-300,ACU-400
Vista de página 35
1 2 ... 31 32 33 34 35 36 37 38 39 40 41 ... 53 54

Comentários a estes Manuais

Sem comentários